What Miami and Miami-Dade County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Miami has to satisfy the city, Miami-Dade County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Miami requires contractors to register and be approved by the Department of Resilience and Public Works, through the iPW electronic permitting system, before working in the City's public right-of-way. [1]Source: City of Miami · checked Nov 11, 2026
The City of Miami does not permit work in Florida Department of Transportation or Miami-Dade County right-of-way; that work must be permitted directly with those agencies. [1]Source: City of Miami · checked Nov 11, 2026
In the City of Miami, construction or demolition disturbing 0.5 acres or more needs a City N.P.D.E.S. permit, and the Stormwater Pollution Prevention Plan (SWPPP) is part of the submittal. [2]Source: City of Miami · checked Nov 11, 2026
Where such work is in the right-of-way, the City N.P.D.E.S. permit must be obtained before the right-of-way permit in iPW, and the City inspects erosion and sediment controls before work starts. [2]Source: City of Miami · checked Nov 11, 2026
Discharging construction dewatering water into the City of Miami storm sewer system needs a City dewatering permit, and the discharge point cannot be connected to a pump station or French drain system. [3]Source: City of Miami · checked Nov 11, 2026
Because dewatering water reaches Biscayne Bay or Blue Lagoon, a Miami-Dade County DERM Class V permit is also required alongside the City dewatering permit. [3]Source: City of Miami · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
City of Miami Bulletin No. 28 (revised July 20, 2023) limits how much of a right-of-way drainage swale an abutting owner may pave, on roads without curbs or gutters, to 66 percent of the property's frontage, with a Driveway Approach construction permit; the rest must stay graded and sodded. [6]Source: City of Miami · checked Nov 11, 2026 · document: 2023-07-20
City of Miami driveway approaches and swale paving follow the City's Resilience and Public Works Engineering Standards for Design and Construction, Indexes R-15, R-16 and R-53. [6]Source: City of Miami · checked Nov 11, 2026 · document: 2023-07-20
The City of Miami's engineering design and construction standards were updated as of September 24, 2020 and are obtained by contacting the Department of Resilience and Public Works. [7]Source: City of Miami · checked Nov 11, 2026 · document: 2020-09-24
The City of Miami has its own private on-site stormwater retention and drainage rules, referenced in City Ordinance 11076 (adopted July 12, 1993). [8]Source: City of Miami · checked Nov 11, 2026 · document: 1993-07-12
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Miami requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.