What Davie and Broward County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Davie has to satisfy the city, Broward County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [1]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [1]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Ask the city’s building or permitting office which application to use for this work.
Forms are always filed with the city or county, never through Flowlex.
See the items to confirm with the city below.
Forms are always filed with the city or county, never through Flowlex. Ask the city’s permitting office which application to use, or send us the request and we will look it up for your project.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Davie requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.