What Miami Beach and Miami-Dade County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Miami Beach has to satisfy the city, Miami-Dade County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Miami Beach Public Works checklist requires signed and sealed drainage calculations, including modeling, showing a 25-year, 3-day storm is treated on site. [1]Source: City of Miami Beach · checked Nov 11, 2026
Drainage calculations must also show the project's impact on public right-of-way storm drainage from a 10-year, 1-day storm. [1]Source: City of Miami Beach · checked Nov 11, 2026
A geotechnical or well-driller's report is required if exfiltration trenches or drainage wells are proposed on the site or in the adjacent right-of-way. [1]Source: City of Miami Beach · checked Nov 11, 2026
Signed and sealed civil plans are required for any proposed on-site storm sewer, sanitary sewer, water or pavement work. [1]Source: City of Miami Beach · checked Nov 11, 2026
For a new home, the City's building checklist also lists Miami-Dade DERM approvals, including a drainage well permit from DERM where applicable. [2]Source: City of Miami Beach · checked Nov 11, 2026
Any work in a public street, sidewalk, easement or the public right-of-way needs a City right-of-way (ROW) permit. [3]Source: City of Miami Beach · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Miami Beach requires the 25-year, 3-day storm to be treated on site as a local Public Works submittal requirement. [1]Source: City of Miami Beach · checked Nov 11, 2026
The City's Environmental Division checks construction sites for sediment and erosion control problems and unpermitted dewatering. [5]Source: City of Miami Beach · checked Nov 11, 2026
The City's Stormwater Division maintains more than 7,800 stormwater structures, 367 outfalls and 49 stormwater pump stations. [6]Source: City of Miami Beach · checked Nov 11, 2026
On a City neighborhood project page, the City notes that private garages are usually drained by private systems (treatment, pumps, injection wells) that the owner must maintain. [7]Source: City of Miami Beach · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Miami Beach requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.