Who issues septic permits in Hollywood, what Broward County requires, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A septic system treats the wastewater from a building that is not connected to a public sewer. Wastewater flows to a buried tank, where solids settle, and then to a drainfield, where the soil finishes the treatment.
Many properties are moving from septic to sewer, so this page also covers sewer connection and septic abandonment where the city publishes it.
Septic work in Hollywood is permitted and inspected by the county health department, with city rules on top. Flowlex coordinates the permits and inspections so your project moves forward without surprises.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
Septic-to-sewer conversions are filed in the Accela portal under the permit type 'Septic to City Sewer Conversion', with a Broward County Uniform Permit application. [1]Source: City of Hollywood · checked Nov 11, 2026 · document: 2.09.26
A plumbing plan is required showing the building, the sewer line to the City lateral, pipe material and size, the cleanout and the septic tank to be abandoned. [1]Source: City of Hollywood · checked Nov 11, 2026 · document: 2.09.26
The checklist also asks for a Broward County Environmental Review Approval Certificate (Development and Environmental Review, Septic to Sewer). [1]Source: City of Hollywood · checked Nov 11, 2026 · document: 2.09.26
Sewer connections, septic-to-sewer conversions and pump-and-abandon work are plumbing permits and must be done by a licensed plumber. [2]Source: City of Hollywood · checked Nov 11, 2026 · document: January 2020
The old septic tank must be taken out of use, either removed or safely sealed (crushed and buried, or filled with concrete or gravel). [3]Source: City of Hollywood · checked Nov 11, 2026
The City provides a connection point and cleanout at the property line; the owner hires a plumber to connect the building to it. [3]Source: City of Hollywood · checked Nov 11, 2026
In Broward County, septic permitting and inspection is still done by the Florida Department of Health in Broward County, while DEP sets the statewide rules and forms. [4]Source: Florida Department of Health in Broward County · checked Nov 11, 2026
The Florida Department of Health in Broward County notes that operating permits are required for aerobic treatment units, performance-based treatment systems, commercial septic systems and industrial-zoned septic systems. [4]Source: Florida Department of Health in Broward County · checked Nov 11, 2026
DEP itself issues septic permits only in the Northwest Florida counties (Escambia to Jefferson, since January 2, 2025) and Marion County (since July 1, 2025); Broward and Miami-Dade permits are still issued by the local county health department. [5]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: 2026-09-24
Since July 1, 2022, property owners (or contractors with owner authorization) may hire a qualified private provider to perform septic system inspections. [6]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: 2026-08-10
Under the amended rule effective July 9, 2025, a private provider authorization (DEP 4015A) must be submitted to the Department before the first inspection. [6]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: 2026-08-10
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
About 44% of Hollywood is unsewered, and those owners maintain their own septic systems. [11]Source: City of Hollywood · checked Nov 11, 2026
The City finished the Washington Industrial Park project (March 2026), a new sanitary sewer system replacing septic systems; affected owners are expected to connect. [12]Source: City of Hollywood · checked Nov 11, 2026 · document: March 2026
Once notified that sewer is available, owners have 90 days to connect; after that a base flow charge is added to the monthly bill. [3]Source: City of Hollywood · checked Nov 11, 2026
Income-eligible owner-occupants who must hook up may get CDBG help covering the connection, septic abandonment and permits, as a forgivable loan. [7]Source: City of Hollywood · checked Nov 11, 2026
A Sewer Reserve Capacity Charge is assessed before the permit is issued, based on the size of the water meter(s). [2]Source: City of Hollywood · checked Nov 11, 2026 · document: January 2020
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
The Florida Department of Health in Broward County issues septic permits and does the inspections, under state rules set by DEP. DEP itself issues permits only in the Northwest Florida counties and Marion County.
Since July 1, 2022, owners, or contractors with the owner’s authorization, may hire a qualified private provider for septic inspections. Under the rule amended July 9, 2025, the authorization form must be submitted before the first inspection.
Yes. Use the “Request the current Hollywood requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
You can book through ClogMasters LLC, an independent company. Flowlex does not perform this service.
Book with ClogMasters LLC (external site, opens in a new tab)Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.