Which grease (FOG) program applies in Miramar, what the rules say, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A grease trap or grease interceptor sits between a kitchen’s drains and the sewer. It slows the water down so fats, oils and grease float to the top and solids settle, and only the cleaner water flows on. The trapped grease is pumped out on a schedule.
Every kitchen in Miramar answers to the utility that treats its wastewater. Flowlex checks which program applies, prepares the permit paperwork and installs a grease system sized for your kitchen.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Miramar issues wastewater discharge permits to industrial users, and the permittee is responsible for renewing its permit on time. [1]Source: City of Miramar · checked Nov 11, 2026 · document: September 17, 2025 (Resolution R25-212)
Miramar industrial user permits expire on the date on the permit cover page, and lapsed permittees are treated as new permittees. [1]Source: City of Miramar · checked Nov 11, 2026 · document: September 17, 2025 (Resolution R25-212)
Florida's grease waste rules (Section 403.0741, F.S., and Chapter 62-705, F.A.C.) require that only licensed grease haulers or self-cleaners remove grease trap/interceptor waste, and that a service manifest be completed for every pump-out. [2]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: 2026-09-29
DEP's table of active industrial pretreatment programs lists the City of Miramar as a municipal program in Broward County. [3]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: PDF metadata 2018-08-15; page counts 67 active programs (page last modified 2023-07-05)
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Ask the city’s building or permitting office which application to use for this work.
Forms are always filed with the city or county, never through Flowlex.
Miramar's Sewer Use Ordinance (Section 21-1.02(c)) lists oil and grease among the constituents for which industrial users may be surcharged above domestic strength. [1]Source: City of Miramar · checked Nov 11, 2026 · document: September 17, 2025 (Resolution R25-212)
The City's adopted fee schedule sets the oil and grease surcharge threshold at concentrations above 200 mg/L. [1]Source: City of Miramar · checked Nov 11, 2026 · document: September 17, 2025 (Resolution R25-212)
Forms are always filed with the city or county, never through Flowlex. Ask the city’s permitting office which application to use, or send us the request and we will look it up for your project.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
DEP’s table of active industrial pretreatment programs lists the City of Miramar. That table is dated 2018, so confirm the current FOG requirements and which utility serves the property with the city.
Only licensed grease haulers, or a business registered to remove its own grease waste, may remove and transport it, and a service manifest is completed for every pump-out.
Yes. Use the “Request the current Miramar requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.