Who issues the sewer connection permit in Fort Lauderdale, who owns which part of the line, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
The house sewer carries wastewater from your building to the public sewer main. When sewer reaches a street, homes on septic connect to it and the old tank is pumped and abandoned under a permit.
In Fort Lauderdale the sewer line, the cleanout and the connection each follow local rules, and who owns which part differs from city to city. Flowlex reads what the city requires and coordinates the permit, the work and the inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Fort Lauderdale makes property owners responsible for connecting their private building sewer to the City sanitary sewer system (City Code Sec. 28-33). [1]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 2, 10/01/2026 (E-ENG-48)
The City's Sewer Connection Permit (Building Services) asks for a permit application, a copy of the contract showing job cost (or an owner-builder affidavit for homeowners), and paid receipts from the City and from Broward County. [2]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 1, 2/23/2017
Any sanitary sewer work in City right-of-way or public utility easements must be done by a Florida Certified General Contractor or Certified Underground Utility and Excavation Contractor. [1]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 2, 10/01/2026 (E-ENG-48)
When a City ROW Sewer Permit is required, the permit is closed out with signed and sealed as-built plans and an Engineering Final Inspection. [1]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 2, 10/01/2026 (E-ENG-48)
The City of Fort Lauderdale prohibits unauthorized connections or discharges to the sanitary sewer, including stormwater (City Code Sec. 28-37). [1]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 2, 10/01/2026 (E-ENG-48)
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Under City Ordinance C-26-13, the City of Fort Lauderdale itself installs new sanitary sewer laterals in public right-of-way or utility easements, coordinated with Utility Services, so no ROW Sewer Permit is needed for that part. [1]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 2, 10/01/2026 (E-ENG-48)
The City's sewer standard details have new or replaced service laterals end 12 inches inside the property line at a depth of 3 feet, unless the building needs a deeper invert. [3]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: E-ENG-04
The City's sewer standard details place the new property cleanout within the public right-of-way, set near the sidewalk or right-of-way line. [3]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: E-ENG-04
The City requires all new or replaced sewer services to be single connections; shared double-wye connections are not allowed. [3]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: E-ENG-04
The City's Inflow & Infiltration program asks owners to keep sewer cleanouts capped and to replace leaking sections of their private sewer lateral. [6]Source: City of Fort Lauderdale · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Florida law requires the owner of a working septic system to connect within 365 days of written notice that sewer is available, or within 90 days of notice from the department if the system needs repair. Check the requirements above for anything Fort Lauderdale adds.
Each city draws that line in a different place. The requirements and local differences above show what Fort Lauderdale publishes; anything it does not publish is listed under “Confirm with the city”.
Yes. Use the “Request the current Fort Lauderdale requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.