New sewer connections, septic-to-sewer conversions, repairs and replacements for the line that carries wastewater from your building to the public sewer, with the permits and inspections coordinated for you.
The house sewer (also called the building sewer or sewer lateral) is the pipe that carries everything from your building’s drains to the public sewer main, usually under the yard and out to the street.
When a neighborhood gets sewer, homes on septic connect to it and the old tank is pumped and abandoned. Older lines also crack, settle or fill with roots over time and need repair or replacement.
Flowlex installs new connections, handles septic-to-sewer conversions, and repairs and replaces existing lines.
Connecting to sewer, or replacing a failing line, involves the city, the utility and often the county health department. Flowlex brings it together: one request, the right permits, and a line built to pass inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
The pipe inside or under the building that collects every fixture’s wastewater.
The line from the building to the property line or the city connection, laid at a steady slope.
Capped access points where the line can be inspected and cleared. Many cities require one at the property line.
The pipe in the right-of-way that joins your line to the public sewer main. Who builds and maintains it depends on the city.
When a home moves from septic to sewer, the old tank is pumped and properly abandoned.
The city inspects the connection, and the health department oversees the septic abandonment.
Several offices are usually involved. Which ones apply depends on where the property is.
Connecting a building to sewer is plumbing work under a permit. Hollywood, for example, says sewer connections and septic-to-sewer conversions require a plumbing permit, and Hallandale Beach says plumbing work needs one.
Source: City of Hollywood: Sewer connection permits (PDF) · City of Hallandale Beach: Plumbing permit FAQThe utility decides where the public side ends. Hallandale Beach maintains pipes up to the property line; Hollywood’s ordinance makes the owner responsible for the service all the way to the main.
Source: City of Hallandale Beach: What not to flush · City of Hollywood: Sewer service responsibility FAQIn Miami-Dade, the Water and Sewer Department sets the steps for a first-time sewer connection. In Broward, the Florida Department of Health in Broward County handles the septic abandonment permit.
Source: Miami-Dade WASD: First-time sewer connection · Florida Department of Health in Broward County: Septic abandonment packet (PDF)General principles only. The actual design comes from the permit and the city’s standards.
The line has to carry everything the building’s fixtures send to it. Cities also set minimum sizes for the public side of the connection.
Too flat, and solids settle and the line clogs. A steady, even slope keeps wastewater moving to the main.
Cleanouts at the right places make the line easy to inspect and clear, without digging it up.
Moving homes from septic to sewer protects groundwater and public health. These are the rules that drive it.
Florida law requires the owner of a working septic system to connect to an available public or investor-owned sewer within 365 days after written notice that the sewer is available.
Source: Section 381.00655, Florida StatutesIf the septic system needs repair, Florida law requires connection to an available sewer within 90 days after written notice from the department.
Source: Section 381.00655, Florida StatutesMiami-Dade County’s Connect 2 Protect is a multi-year program to move homes from septic systems to sanitary sewer.
Source: Miami-Dade County: Connect 2 ProtectEvery city handles sewer connections a little differently. These examples come from the cities’ own documents; each city page lists the full local requirements.
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
The City of Hollywood says connecting a building to the City sewer requires a plumbing permit, and that sewer connections and septic-to-sewer conversions must be done by a licensed plumber.
Source: City of Hollywood: Sewer connection permits (PDF)The City of Miramar issues a Sewer Tie-In permit through its Building Division and requires a sewer connection inspection, a septic tank abandonment inspection and a final inspection.
Source: City of Miramar: Sewer Tie-In permit package (PDF)In Fort Lauderdale, sanitary sewer work in City right-of-way or public utility easements must be done by a Florida Certified General Contractor or Certified Underground Utility and Excavation Contractor.
Source: City of Fort Lauderdale: ROW Sewer Permit Requirements (PDF)In Broward County, the septic tank abandonment application asks for a site plan showing the septic system and a pump-out receipt from a licensed waste hauler.
Source: Florida Department of Health in Broward County: Septic abandonment packet (PDF)Flowlex reviews what your city requires during the site visit, coordinates the permit paperwork and schedules the inspections. Permit fees are listed separately in your written price.
Call, use the form or message us on WhatsApp with the address and what you need: a new connection, a septic-to-sewer conversion or a repair.
We locate the existing line, cleanout and septic tank, and check the route to the city connection.
You get the scope and price in writing before any work begins.
The required permits are applied for, then the line is installed and connected to the city connection point.
The connection is inspected and, for conversions, the septic tank is pumped and abandoned under its permit.
Florida law requires connection within 365 days of written notice from the sewer provider for a working septic system, or within 90 days of notice from the department if the system needs repair. Some cities set their own, shorter deadlines; see your city page.
It depends on the city. Hallandale Beach maintains pipes up to the property line, while Hollywood makes the owner responsible for the service all the way to the main. Each city page shows what that city publishes.
It is pumped and abandoned under a permit. In Broward County the abandonment application asks for a site plan and a pump-out receipt from a licensed waste hauler.
It depends on the length of the line, what the city requires and whether a septic tank has to be abandoned. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Flowlex connects, repairs and replaces house sewer lines for homes and businesses in these cities and the areas around them.
Cities with a dark outline have their own page with the local requirements and links to the official forms.
Don’t see your city? Call us or send a request, we may still be able to help.
Based at 1416-3 N Dixie Hwy, Hollywood, FL 33020. Serving Miami-Dade, Broward and Palm Beach Counties and the surrounding areas, extending north to the Orlando area. Other services: Storm Drain Systems · Septic Tank Systems · Grease Trap Systems.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project, and we review it and follow up by phone or email.