What Deerfield Beach and Broward County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Deerfield Beach has to satisfy the city, Broward County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Deerfield Beach Engineering Permit application must be submitted with two sets of approved, signed and sealed plans (24x36 for commercial, 11x17 for residential). [1]Source: City of Deerfield Beach · checked Nov 11, 2026
The City's Engineering Division inspects the work during construction, and improvements that do not match the approved plans must be removed and rebuilt. [1]Source: City of Deerfield Beach · checked Nov 11, 2026
The City asks for images and/or a video tour of the site before an engineering permit can be approved. [1]Source: City of Deerfield Beach · checked Nov 11, 2026
When the work is finished, the permit holder must arrange a final inspection with the City's engineering inspectors. [1]Source: City of Deerfield Beach · checked Nov 11, 2026
Work that needs a maintenance-of-traffic (MOT) plan must have it prepared by a qualified person, and work on county or state roads needs MOT approval from that agency. [1]Source: City of Deerfield Beach · checked Nov 11, 2026
The City says new development and redevelopment must build, at their own expense, storm sewer systems and stormwater detention facilities for their runoff. [2]Source: City of Deerfield Beach · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [3]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [3]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Deerfield Beach's comprehensive plan sets peak stormwater discharge from a three-day, 25-year design storm, capped at 35 cubic feet per second per square mile. [5]Source: City of Deerfield Beach · checked Nov 11, 2026
The City maintains stormwater pipes in easements and rights-of-way, not drainage in private yards. [2]Source: City of Deerfield Beach · checked Nov 11, 2026
Drainage canals and ditches in the City are maintained by Broward County and the City's Storm Water Division, and dumping in them is prohibited. [6]Source: City of Deerfield Beach · checked Nov 11, 2026
The City's engineering permit form warns that other permits may also be needed, for example from water management districts or state agencies. [1]Source: City of Deerfield Beach · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Deerfield Beach requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.