Who issues the sewer connection permit in Hollywood, who owns which part of the line, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
The house sewer carries wastewater from your building to the public sewer main. When sewer reaches a street, homes on septic connect to it and the old tank is pumped and abandoned under a permit.
In Hollywood the sewer line, the cleanout and the connection each follow local rules, and who owns which part differs from city to city. Flowlex reads what the city requires and coordinates the permit, the work and the inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Hollywood says connecting a building to the City sewer requires a plumbing permit, and sewer connections and septic-to-sewer conversions must be done by a licensed plumber. [1]Source: City of Hollywood · checked Nov 11, 2026 · document: January 2020
Septic-to-sewer conversions are filed in the City's Accela portal as a plumbing permit applied for by the licensed contractor; the City says the permit must cover both the sewer connection and the septic tank abandonment. [2]Source: City of Hollywood · checked Nov 11, 2026 · document: March 02, 2026
The City's checklist requires a plumbing plan showing the building, the sewer line from the building to the City lateral, the cleanout and the septic tank to be abandoned. [3]Source: City of Hollywood · checked Nov 11, 2026 · document: 2.09.26
The City provides the connection point and a cleanout at the property line; the owner hires a plumber to run the private line from the building to that point. [4]Source: City of Hollywood · checked Nov 11, 2026
After the permit is issued, the contractor installs the private sewer lateral, disconnects the septic system, pumps and abandons the tank under Broward County requirements, and the City inspects the work. [2]Source: City of Hollywood · checked Nov 11, 2026 · document: March 02, 2026
Florida law (s. 381.00655, F.S.) requires the owner of a working septic system to connect the building's plumbing to an available public sewer within 365 days after the utility's written notice that sewer is available. [5]Source: Florida Statutes · checked Nov 11, 2026 · document: Statute history through ch. 2023-169
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Hollywood's City Ordinance § 52.07(B)(1) makes the property owner responsible for the sewer service from the property to the City main in the right-of-way; the City repairs the part from the property line to the main only when damaged by vehicle traffic. [10]Source: City of Hollywood · checked Nov 11, 2026
Once the City notifies owners that sewer is available, they have 90 days to connect; the City's own deadline is shorter than the 365 days in state law. [4]Source: City of Hollywood · checked Nov 11, 2026
Permit applications can be submitted early, but the City will not issue the permit until the 90-day notification letter is mailed and the Sewer Reserve Capacity Charge is paid. [2]Source: City of Hollywood · checked Nov 11, 2026 · document: March 02, 2026
About 44% of Hollywood is unsewered (properties not connected to the City wastewater system). [11]Source: City of Hollywood · checked Nov 11, 2026
The completed Hollywood Hills sewer extension included 135 laterals with cleanouts. [12]Source: City of Hollywood · checked Nov 11, 2026
Income-eligible owner-occupants who must hook up may get CDBG help covering the connection, septic abandonment and permits. [7]Source: City of Hollywood · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Florida law requires the owner of a working septic system to connect within 365 days of written notice that sewer is available, or within 90 days of notice from the department if the system needs repair. Check the requirements above for anything Hollywood adds.
Each city draws that line in a different place. The requirements and local differences above show what Hollywood publishes; anything it does not publish is listed under “Confirm with the city”.
Yes. Use the “Request the current Hollywood requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.