Who issues the sewer connection permit in Dania Beach, who owns which part of the line, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
The house sewer carries wastewater from your building to the public sewer main. When sewer reaches a street, homes on septic connect to it and the old tank is pumped and abandoned under a permit.
In Dania Beach the sewer line, the cleanout and the connection each follow local rules, and who owns which part differs from city to city. Flowlex reads what the city requires and coordinates the permit, the work and the inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
Florida law (s. 381.00655, F.S.) requires the owner of a working septic system to connect the building's plumbing to an available public sewer within 365 days after the utility's written notice that sewer is available. [1]Source: Florida Statutes · checked Nov 11, 2026 · document: Statute history through ch. 2023-169
Under the same Florida law, an owner whose septic system needs repair or modification must connect to available public sewer within 90 days after written notice from the Florida Department of Health. [1]Source: Florida Statutes · checked Nov 11, 2026 · document: Statute history through ch. 2023-169
The City of Dania Beach describes its Building Division as accepting and processing permit applications, reviewing plans and conducting inspections. [2]Source: City of Dania Beach · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Dania Beach runs its own sewer utility; a 2024-25 state funding request describes rebuilding the City's Lift Station No. 11, which serves about 500 customers. [6]Source: flsenate.gov · checked Nov 11, 2026 · document: FY 2024-25
Florida DEP's 2023-24 statewide resilience plan lists a Broward County project, 'Dania Cut-Off Canal Resilience: Septic to Sewer Conversion'. [7]Source: Florida Department of Environmental Protection · checked Nov 11, 2026 · document: 2023-24 plan
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Florida law requires the owner of a working septic system to connect within 365 days of written notice that sewer is available, or within 90 days of notice from the department if the system needs repair. Check the requirements above for anything Dania Beach adds.
Each city draws that line in a different place. The requirements and local differences above show what Dania Beach publishes; anything it does not publish is listed under “Confirm with the city”.
Yes. Use the “Request the current Dania Beach requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.