What Fort Lauderdale and Broward County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Fort Lauderdale has to satisfy the city, Broward County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Fort Lauderdale's Engineering Permitting Division reviews site plans for the adequacy of storm water management systems and issues construction permits for storm water collection systems. [1]Source: City of Fort Lauderdale · checked Nov 11, 2026
The City lists stormwater swale, grading, structure (catch basin / manhole), pipe, pump station and tidal valve work in the City right-of-way under a ROW Stormwater Permit, and its guide marks a bond as required for these. [2]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 13, 10/01/2026
City as-built record drawings for water, wastewater and stormwater work must use NAD 83 State Plane coordinates and elevations referenced to NAVD88. [3]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 6, 10/01/2026
The City requires a permit for any work in the Special Flood Hazard Area, including excavation, filling, paving, grading and land clearing. [4]Source: City of Fort Lauderdale · checked Nov 11, 2026
The City's NPDES page says a construction Stormwater Pollution Prevention Plan (SWPPP) must include a site map with drainage patterns and erosion and sediment controls, signed by all contractors. [5]Source: City of Fort Lauderdale · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
The City of Fort Lauderdale requires new seawalls to be built to a minimum top elevation of 5 feet. [10]Source: City of Fort Lauderdale · checked Nov 11, 2026
City crews maintain a network of tidal valves on the storm system, and the City's right-of-way permit list includes a separate stormwater tidal valve permit type. [10]Source: City of Fort Lauderdale · checked Nov 11, 2026
Swale installation in the City is done to City Engineering Standard Detail D4.2R, with a City form signed by both property owner and contractor to support permit closure. [9]Source: City of Fort Lauderdale · checked Nov 11, 2026 · document: Rev 6, 10/01/2026
The City holds an NPDES stormwater permit from the Florida Department of Environmental Protection that requires it to run stormwater management programs. [5]Source: City of Fort Lauderdale · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Fort Lauderdale requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.